top of page
Screen Shot 2022-07-01 at 2.20.03 PM.png

The Point
Retail / Exterior Finishes

Advanced Framing Structures was contracted to build the high end shopping center in Souther California including Ground Up Steel Structures, wood floors and roof.

​

AFS HIGHLIGHTS

​

  • Snyder Langston

  • High end shopping center in El Segundo California

  • Total Contract Value = $1,500,000

  • 4 Ground up Steel Structures with wood floors and roofs. Building A = 18,000 SF, Building B = 18,000 SF, Building C = 29,000 SF, Building D = 50,000 SF. Total SF of framing = 115,000 SF.

  • Plywood over steel stud skin. Roughly 2000 Sheets.

  • IPE Rain Screen Siding System. Roughly 8,000 SF

  • Thermory Wood Decking throughout site. Roughly 2,000 SF

  • Participated in design and Value Engineering of Siding Systems.

​

AFS Services: 

Client Testimonial

Advanced Framing Structures did a fantastic job on the recently completed Confluence Park project. The exterior wood elements are the prominent feature of this project and it looks amazing. Your crews helped us resolve constructability issues and provided the extra man power needed to pull off this very fast pace schedule. The added stainless steel spacers and attention to detail is always evident in your guys work. Thank you so much.

 

Brent Mathews,

Division Leader

Consolidated Contracting Services Inc.

​

Consolidated-Contracting-Logo-Red-575px-1.png
Screen Shot 2022-07-03 at 2.34.31 PM.png
Screen Shot 2022-07-01 at 2.21.30 PM.png
Screen Shot 2022-07-01 at 2.22.04 PM.png
Screen Shot 2022-07-01 at 2.26.32 PM.png
Screen Shot 2022-07-01 at 2.20.03 PM.png
Screen Shot 2022-07-01 at 2.23.20 PM.png
Screen Shot 2022-07-01 at 2.25.56 PM.png
Screen Shot 2022-07-01 at 2.23.58 PM.png

See More Remodel Work

bottom of page